博士入学面试英文自我介绍篇1
Good afternoon,professors!I am great honored to meet you here.Now allow me to give a brief self-introduction.
My name is __,__ years old,born in __ city,__ province. I have been working for nearly __ years.I am open-minded,quick in thought and very fond of history.In my spare time,I have broad interest like many other youngers.
In year __,I entered __,major in __.After my graduation,I entered __ University to study my postgraduate course,major in __.In those 7 years study,I worked hard,and I gained scholarship for many times.
During 3 years study in __ University, under the strict guidance of my tutor,I have learned systematically the theory of __.I benefit from working together with excellent colleague.__ University shares many same characteristics with __x University.Both of them have a refreshing,scholarly atmosphere.
After my graduation in __, I worked in __.I got a position in __.However,with time going on,the more I experienced,the clearer I realized that I am really interested in __.I am eager to learn more about __ and I hope I can study further.I wish to find a way to solve the complicated problem in my daily work.
So I started the way to pursuing my studies in __,and work hard for about half year.Now all my hard word has got a result since I have a chance to be interview by you. If luckily I got the chance to learn __,I will work harder than before.
Thank you!
博士入学面试英文自我介绍篇2
Good morning ,and nice to see you at this sunny /rainy/cloudymorning. It is really my honor to have this opportunity for a interview / i am very glad to be here for this interview. I hope i can make a good performance today. I'm confident that I can succeed. Now i will introduce myself briefly: My name S ,But you call me Leo,it's my english name. I am 36 years old,and was borned in a beautiful village Heilongjiang province ,northeast of China. I was graduated from Qi university. my major is materials engineering. and i got my bachelor degree after my graduation in the year of 2005. In July 2005, I begin work for B as a trainee in line 3. now I'm a process engineer,work for the Limited Company. I have passed CET4 and i have acquired basic knowledge of my major during my work time. Because I think I'm capable of more responsibilities, so I decided to change my job. So in August 2009,I left line 3 to off-line coating workshop as a team leader. NOW I want to change my working environment, I'd like to find a job which is more challenging.
** is a global company, so I feel I can gain the most from working in this kind of company ennvironment. That is the reason why I come here to compete for this position. I think I'm a good team player and I'm a person of great honesty to others. Also I am able to work under great pressure. Although I am poorly experienced in sail field, but I will try my best to study hard。I think I can do better。 That’s all. Thank you for giving me the chance./Thank you so much!
篇2:面试英语自我介绍常用词汇句子句型
面试英语自我介绍的常用词汇Words & e*pression_rs:
part-time job: 兼职工作
full-time: 全职
position / vacancy: 职位,空缺
manager: 经理
director: 主任
president: 董事长,总经理
General Manager: 总经理
saleperson: 推销员
engineer: 工程师
accountant: 会计
degree: 学位
introduce:(动词) 介绍introduction: (名词)介绍
Let me introduce myself. / Let me do some introduction. 让我来介绍一下自己。
Which aspect do you want to know about me?
或者 What do you want to know about myself? 您想知道我哪方面的情况?
面试英语自我介绍的常用基本的句子:
1. I noticed that you advertised a job in this morning’s paper. 我看到你们在今早的报纸上刊登的招聘广告。
2. I’m coming for your advertisement for …. 我是来应聘你们广告上的……职位的。
3. I have applied for the position of …. 我申请了贵公司的……职位。
4. Do you have any job for a part-timer? 你们需要兼职吗?
5. I’d like to know if you need any full-time secretary. 我想知道你们是否需要全职秘书?
6. I’m looking for a job. Are there any vacancies? 我在找工作,请问你们有空缺吗?
面试英语自我介绍的常用句型:
1. I got a degree in Literature and took a course in typing. 我获得了文学学士学位,还学过打字。
2. I haven’t done anything like that before. 我以前没有做过这种工作。
3. I think I’m quite fit for assistant’s job. 我觉得我很适合做助理的工作。
4. I used to work as a sale’s manager. 我以前做销售经理。
5. I’m quite familiar with editing. 我做过很多编辑工作。
6. I want a job with a vacation every year. 我想找个每年都能度假的工作。
7. I was thinking of a job in a school. 我打算到学校找份工作。
8. I worked in the accounting section of a manufacturer of electrical products. 我曾在电子产品制造商的会计组工作。
9. I love playing tennis. 我喜欢打网球。
篇3:客服面试自我介绍
客服面试自我介绍
要面试客服如何去做自我介绍呢?不同的行业应该有不同的自我介绍,下面是一则客服面试自我介绍范文。
大家好!我叫×××,毕业于××学校××专业,选修***。在学校期间,主修的专业课有×××(此处添加应聘职位相关专业课或说成选修课为应聘职位所需课程,尤其重要),根据所学的知识,也参加过一些具体项目的事实,比如学院独有的精品课×××,在其中负责××主模块或者担任××组长工作,应用了×××(应聘相关的课程)技能及财务知识等,取得了×××什么样的成果。并在实践中,加深了对××的认识,提高了此类工作的实际操作能力。
另外,在学校中也参加过一些社团活动,比如××(此处最好说1-2样如学院××周年校庆活动或院运会),在其中加强了和同学们的交流,全方面认识了团队协作的带来的效率,对团队合作和责任感有了新的感受和知识。个性上,首先是比较诚实、乐观、热情。
其次,具有团队精神,踏实努力,很强的责任心。在这里应聘贵企业的××职位,是想将自己的所学得到充分发挥,并在这里学习成长。
希望有这样的机会,能和诸位成为同事。我的情况大概就是这样,请问有什么其他方面想要了解的么?我会如实一一回答您的提问。谢谢!