常用生产管理物控专用术语
1.A/M---action memo.
2.AVL---avail vendor list
3.ASSY---assemble
4.BOM---bill of material
5.BFM---buy from
6.BU---business unit
7.BIOS--- basic input/output system
8.CFM---consign from
9.CCB--- change control board
10.DOA--- dead on arrival
11.DVT--- design verification test
12.DC---document center
13.DIMM---sdram
14.ETA---estimate time of arrival
15.ETD---estimate time of deliver
16.ERP---enterprise resource plan
17.EVT--- Engineering Value Test
18.EBOM--- engineering bill of material
19.ECO---engineering change order
20.ECR---engineering change requirement
21.EDI--- electronic data interchange
22.ECN---engineer change note
23.FIFO---first in, first out
24.F/T---function test
25.JIT---just in time
26.KC---key component
27.L/T---lead time
28.MRP---material require plan
29.MPS---master production schedule
30.MDS---master demand schedule
31.MN---manufacturing notice
32.MP---mater production
33.MO---manufacturing order
34.MBOM---manufacturing bill of material
35.MFG---manufacturing
36.MPI---manufacturing process instruction
篇2:企业生产物控管理要点
企业的生产与物控管理要点
生产与物控是企业的总调度,整个企业的生产与物料运作都是围绕着这个部门运转的,PMC部门计划能力、控制能力与协调能力对企业的运作有非常重要的影响。
企业要建立良好的生产与物控管理,应做到:
1.建立制定完善的生产与物控运作体系(即从销售到出货的整体运作程序)。
2.预测及制定鞍为台理的短、中、长期销售计划。
3.对自身的生产能力负荷预先进行详细的分析,并建立完善的资料。
4.生产前期做好完整的月销货计划(生产总排程)和周生产计划。
5.配合生产计划做到良好的物料控制。
6.对生产进度及物料进度的及时跟进以及沟通协调。