  常用生产管理物控专用术语

  1.A/M---action memo.

  2.AVL---avail vendor list

  3.ASSY---assemble

  4.BOM---bill of material

  5.BFM---buy from

  6.BU---business unit

  7.BIOS--- basic input/output system

  8.CFM---consign from

  9.CCB--- change control board

  10.DOA--- dead on arrival

  11.DVT--- design verification test

  12.DC---document center

  13.DIMM---sdram

  14.ETA---estimate time of arrival

  15.ETD---estimate time of deliver

  16.ERP---enterprise resource plan

  17.EVT--- Engineering Value Test

  18.EBOM--- engineering bill of material

  19.ECO---engineering change order

  20.ECR---engineering change requirement

  21.EDI--- electronic data interchange

  22.ECN---engineer change note

  23.FIFO---first in, first out

  24.F/T---function test

  25.JIT---just in time

  26.KC---key component

  27.L/T---lead time

  28.MRP---material require plan

  29.MPS---master production schedule

  30.MDS---master demand schedule

  31.MN---manufacturing notice

  32.MP---mater production

  33.MO---manufacturing order

  34.MBOM---manufacturing bill of material

  35.MFG---manufacturing

  36.MPI---manufacturing process instruction

篇2:企业生产物控管理要点

  企业的生产与物控管理要点

  生产与物控是企业的总调度,整个企业的生产与物料运作都是围绕着这个部门运转的,PMC部门计划能力、控制能力与协调能力对企业的运作有非常重要的影响。

  企业要建立良好的生产与物控管理,应做到:

  1.建立制定完善的生产与物控运作体系(即从销售到出货的整体运作程序)。

  2.预测及制定鞍为台理的短、中、长期销售计划。

  3.对自身的生产能力负荷预先进行详细的分析,并建立完善的资料。

  4.生产前期做好完整的月销货计划(生产总排程)和周生产计划。

  5.配合生产计划做到良好的物料控制。

  6.对生产进度及物料进度的及时跟进以及沟通协调。